Skip to content

INTERNATIONAL JOURNAL OF ENGINEERING, PURE AND APPLIED SCIENCES

ISSN NO. 2456-3129
IF:0.267(Peer-Reviewed and Refereed Journal)

VOL. 6 NO. 4 DEC- 2021

  • by

Download Sample File :

  1. Minimizing Rental Cost in Two Stage Flow Shop Scheduling Problem Including Arbitrary Lags with Job Weightage (Harminder Singh,Deepak Gupta,Renuka)PDF

Join the conversation

Your email address will not be published. Required fields are marked *